Solar on two reservoir covers
2024 to 2025- Project
- Solar on two reservoir covers
- Type
- Roof-mounted solar and equipment anchorage
- Location
- Ventura County, CA
- Year
- 2024 to 2025
- Client / collaborators
- Ventura Energy
- Photos
- Ventura Energy, February 2026
- Status
- Completed
ChallengePut solar arrays on the standing seam metal roofs of two new reservoir covers, so no farmland comes out of production.
ESSE scopeElie Sayegh Structural Engineering checked uplift through the clamps, roof deck and cover framing, designed the anchorage of the electrical equipment and its steel frames, and issued the construction set.
A grower cooperative is moving its irrigation from open canals to pressurized pipe, and pressure costs power. The answer was to put the solar on top of the water: arrays on the metal roofs of two new reservoir covers, so no farmland comes out of production.
We engineered the solar attachment to the standing seam roofs, checking uplift through the clamps, the deck and the cover framing below, and the anchorage of the electrical equipment and its steel frames on the ground. The work ran from the first submittal in December 2024 through a construction set in August 2025.
The power the covers make pays for the pumping that fills them.